Adds powers and duties to the canal corporation; directs the canal corporation to cause the design, preparation of plans, estimates and specifications and the supervision of the erection, construction, repair and removal of all structures referred to be performed by a licensed professional engineer; directs preparation of a flood response plan; makes related provisions.
Sponsor: Destito (MS) / Multi-sponsor(s): Boyland, Clark, Glick, Magee, Markey, Mayersohn, McEneny, Sweeney, Towns, Weisenberg / Co-sponsor(s): Lavine, Reilly, Schroeder
Law Section: Canal Law / Law: Amd S10, Can L
Sponsor: Destito (MS) / Multi-sponsor(s): Boyland, Clark, Glick, Magee, Markey, Mayersohn, McEneny, Sweeney, Towns, Weisenberg / Co-sponsor(s): Lavine, Reilly, Schroeder
Law Section: Canal Law / Law: Amd S10, Can L
A1442-2011 Actions
- Mar 9, 2011: enacting clause stricken
- Jan 10, 2011: referred to corporations, authorities and commissions
A1442-2011 Text
S T A T E O F N E W Y O R K
1442 2011-2012 Regular Sessions I N ASSEMBLY January 10, 2011
Introduced by M. of A. DESTITO, LAVINE, REILLY, SCHROEDER -- Multi-Spon sored by -- M. of A. BOYLAND, CLARK, GLICK, MAGEE, MARKEY, MAYERSOHN, McENENY, SWEENEY, TOWNS, WEISENBERG -- read once and referred to the Committee on Corporations, Authorities and Commissions
AN ACT to amend the canal law, in relation to the general powers and duties of the canal corporation
THE PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND ASSEM BLY, DO ENACT AS FOLLOWS:
Section 1. Subdivision 16 of section 10 of the canal law, as amended by chapter 335 of the laws of 2001, is amended and three new subdivi sions 3-a, 9-b and 9-c are added to read as follows:
3-A. CAUSE THE DESIGN, PREPARATION OF PLANS, ESTIMATES AND SPECIFICA TIONS AND THE SUPERVISION OF THE ERECTION, CONSTRUCTION, REPAIR AND REMOVAL OF ALL STRUCTURES HERETOFORE REFERRED TO BE PERFORMED BY A LICENSED PROFESSIONAL ENGINEER. 9-B. OPERATE THE CANAL SYSTEM IN SUCH A MANNER WHICH MITIGATES FLOOD ING ALONG THE SYSTEM TO PROTECT TO THE EXTENT POSSIBLE LIFE AND PROPERTY ON AND ALONG THE CANAL SYSTEM WHEN EXPECTED AND ACTUAL CONDITIONS WARRANT. 9-C. CAUSE A FLOOD RESPONSE PLAN TO BE CREATED TO RESPOND TO EXPECTED AND ACTUAL FLOODING IN THE CANAL SYSTEM. (1) THE FLOOD RESPONSE PLAN SHALL INCLUDE, BUT NOT BE LIMITED TO:
(I) A PLAN OF ACTION FOR COMMUNICATION WITH MARINERS, COUNTY EMERGENCY MANAGERS AND APPROPRIATE OFFICIALS, AND THE STATE EMERGENCY MANAGEMENT OFFICE; (II) INTERNAL COMMAND AND REPORTING COORDINATION; (III) CANAL INFRASTRUCTURE OPERATION, TO INCLUDE PREEMPTIVE MEASURES; AND (IV) OTHER ELEMENTS AS DETERMINED BY THE CORPORATION AND THE DEPART MENT OF ENVIRONMENTAL CONSERVATION. EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets [ ] is old law to be omitted. LBD01701-01-1
A. 1442 2 (2) SUCH PLAN SHALL BE PREPARED IN CONSULTATION WITH THE STATE EMER GENCY MANAGEMENT OFFICE AND EMERGENCY MANAGERS FROM COUNTIES ADJACENT OR INTERSECTED BY THE CANAL SYSTEM AND THE COMPLETED PLAN MUST BE FILED WITH THE OFFICES THEREOF. (3) THE CORPORATION SHALL SUBMIT A COPY OF SUCH PLAN TO THE DEPARTMENT OF ENVIRONMENTAL CONSERVATION WITHIN SIX MONTHS OF THE EFFECTIVE DATE OF THIS SUBDIVISION, AND ANNUALLY UPDATE AND SUBMIT SUCH PLAN THEREAFTER. 16. Cause to be removed from canal lands AND WATERS any encroachments which in its judgment are detrimental, INCLUDING THE REMOVAL OF DEBRIS.
S 2. This act shall take effect immediately.

*By contributing or voting you agree to the Terms of Participation and Privacy Policy and verify you are over 13.
Discuss!
blog comments powered by Disqus