S T A T E   O F   N E W   Y O R K
       ________________________________________________________________________

                                         1061

                              2011-2012 Regular Sessions

                                   I N  S E N A T E

                                      (PREFILED)

                                    January 5, 2011
                                      ___________

       Introduced  by  Sens. PARKER, PERKINS -- read twice and ordered printed,
         and when printed to be committed to the Committee on Energy and  Tele-
         communications

       AN  ACT  to  amend the public service law, in relation to New York state
         renewable electric generation pilot programs

         THE PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND  ASSEM-
       BLY, DO ENACT AS FOLLOWS:

    1    Section  1.  The public service law is amended by adding a new section
    2  73 to read as follows:
    3    S 73. NEW YORK STATE RENEWABLE ELECTRIC GENERATION PILOT PROGRAMS.  1.
    4  THE  COMMISSION SHALL ESTABLISH NEW YORK STATE RENEWABLE ELECTRIC GENER-
    5  ATION PILOT PROGRAMS TO AUTHORIZE THE DEVELOPMENT OF UP TO THREE HUNDRED
    6  MEGAWATTS OF RENEWABLE ELECTRIC CAPACITY STATEWIDE, IN ORDER  TO  STIMU-
    7  LATE THE GROWTH OF CLEAN, AFFORDABLE, AND RELIABLE SOURCES OF ENERGY AND
    8  TO FOSTER NEW PARTNERSHIPS BETWEEN ELECTRIC CORPORATIONS, ENERGY PRODUC-
    9  ERS AND ENERGY CUSTOMERS IN NEW YORK STATE.
   10    2.  (A)  THE  COMMISSION SHALL OVERSEE THE IMPLEMENTATION OF THE PILOT
   11  PROGRAMS AND SHALL DIRECT ELECTRIC CORPORATIONS TO BUILD OR CAUSE TO  BE
   12  BUILT RENEWABLE ENERGY FACILITIES TO BE FINANCED UNDER TERMS ESTABLISHED
   13  THROUGH  AN  ORDER  OF  THE COMMISSION WHICH SHALL AUTHORIZE CAPITAL AND
   14  OPERATING COSTS TO BE RECOVERED IN THE CORPORATIONS  RATE  BASE  AND  TO
   15  EARN  A  REASONABLE RETURN OVER A PERIOD TO BE DETERMINED BY THE COMMIS-
   16  SION, PROVIDED THAT THE  CORPORATION  SHALL,  AT  MINIMUM,  PROVIDE  THE
   17  COMMISSION WITH THE FOLLOWING:
   18    (I)  A  DETAILED  DESCRIPTION  AND ECONOMIC EVALUATION OF THE PROPOSED
   19  INVESTMENT;
   20    (II) A DISCUSSION OF THE COSTS, BENEFITS, AND RISKS OF  THE  PROPOSAL,
   21  INCLUDING  AN  ANALYSIS OF THE COSTS, BENEFITS, AND RATE IMPLICATIONS TO
   22  THE PARTICIPATING CUSTOMERS, TO THE COMPANY'S DEFAULT SERVICE CUSTOMERS,
   23  AND TO THE UTILITY'S DISTRIBUTION CUSTOMERS;

        EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets
                             [ ] is old law to be omitted.
                                                                  LBD00883-01-1

S. 1061 2 1 (III) A DESCRIPTION OF ANY EQUIPMENT OR INSTALLATION SPECIFICATIONS, 2 SOLICITATIONS, AND PROCUREMENTS IT HAS IMPLEMENTED OR INTENDS TO IMPLE- 3 MENT; 4 (IV) A SHOWING THAT IT HAS MADE REASONABLE EFFORTS TO INVOLVE LOCAL 5 BUSINESSES IN ITS PROGRAM; 6 (V) EVIDENCE OF COMPLIANCE WITH ALL APPLICABLE EMISSION LIMITATIONS; 7 AND 8 (VI) A COPY OF ANY CUSTOMER CONTRACTS OR AGREEMENTS TO BE EXECUTED AS 9 PART OF THE PROGRAM. 10 (B) RENEWABLE GENERATION FACILITIES ELIGIBLE TO BE CONSTRUCTED AND 11 FINANCED UNDER THE NEW YORK STATE RENEWABLE ELECTRIC GENERATION PILOT 12 PROGRAMS SHALL: 13 (I) GENERATE ELECTRICITY THROUGH USE OF THE FOLLOWING TECHNOLOGIES: 14 SOLAR; WIND; PHOTOVOLTAICS; TIDAL; GEOTHERMAL; AND FUEL CELLS; OR 15 (II) GENERATE ELECTRICITY THROUGH LOW-IMPACT, RUN-OF-RIVER HYDROELEC- 16 TRIC ELECTRIC GENERATING EQUIPMENT WITH CAPACITY UP TO THIRTY MEGAWATTS 17 WITH NO NEW STORAGE IMPOUNDMENT; 18 (III) BE MANUFACTURED, INSTALLED AND OPERATED IN ACCORDANCE WITH 19 APPLICABLE GOVERNMENT AND INDUSTRY STANDARDS; 20 (IV) CONNECT TO THE ELECTRIC SYSTEM AND OPERATED IN PARALLEL WITH AN 21 ELECTRIC CORPORATION'S TRANSMISSION AND DISTRIBUTION FACILITIES; 22 (V) OPERATE IN COMPLIANCE WITH ANY STANDARDS AND REQUIREMENTS ESTAB- 23 LISHED BY THE COMMISSION; AND 24 (VI) BE LOCATED WITHIN THE STATE, INCLUDING FACILITIES THAT CONSIST OF 25 CUSTOMER-OWNED OR LEASED GENERATORS. 26 (C) AUTHORIZE ELECTRIC CORPORATIONS TO OWN AN EQUITY INTEREST IN SUCH 27 FACILITIES AND ALLOW PARTNERSHIPS WITH INDEPENDENT POWER PRODUCERS, 28 DEVELOPERS, AND/OR CUSTOMER-OWNED OR LEASED GENERATORS. 29 S 2. The public service commission shall provide an annual report on 30 or before the first day of June to the governor, the temporary president 31 of the senate, the speaker of the assembly, the minority leader of the 32 senate, and the minority leader of the assembly reporting the progress 33 of their efforts and the effects of the program on the environment and 34 public. Such report shall identify each facility participating in the 35 pilot project and shall include, but not be limited to, information on 36 each energy source or sources used for generation at such facility; the 37 sum capacity, in megawatts, of all electrical generating equipment used 38 by the facility; the date the facility will begin or has begun generat- 39 ing electricity; and the number and category of customer-owned or leased 40 generators. 41 S 3. This act shall take effect immediately; provided, however, that 42 not later than the one hundred eightieth day after this act shall have 43 become a law, the public service commission shall have in place a 44 competitive process which shall be open to electric corporations.