Creates the New York solar industry development and jobs act; relates to procurement of solar renewable energy credits; establishes schedule with annual percentages to be met for compliance years.
Sponsor: Englebright
Law Section: Public Service Law
Law: Add S66-m, Pub Serv L; amd SS1005 & 1854, ren SS1020-hh - 1020-jj to be SS1020-ii - 1020-kk, add S1020-hh, Pub Auth L
Multi-sponsor(s):
Boyland, Boyle, Castelli, Ceretto, Conte, Curran, Cymbrowitz, Glick, Gottfried, Heastie, Katz, Lentol, Lopez P, McDonough, McEneny, McKevitt, Millman, Montesano, Murray, Nolan, O'Donnell, Perry, Raia, Reilly, Saladino, Sayward, Sweeney, Wright
Co-sponsor(s):
Cahill, Schimel, Brennan, Rosenthal, Crespo, Lifton, Colton, Lupardo, Paulin, Latimer, Galef, Dinowitz, Linares, Moya, Russell, Jaffee, Rivera P, Abinanti, Thiele, Weisenberg, Benedetto, Roberts, Gunther, Maisel, Lavine, Markey, Kavanagh, Kellner, Peoples-Stokes
Committee: WAYS AND MEANS
Law Section: Public Service Law
Law: Add S66-m, Pub Serv L; amd SS1005 & 1854, ren SS1020-hh - 1020-jj to be SS1020-ii - 1020-kk, add S1020-hh, Pub Auth L
A5713-2011 Actions
- Feb 2, 2012: enacting clause stricken
- Jan 4, 2012: referred to energy
- Jun 16, 2011: print number 5713c
- Jun 16, 2011: amend (t) and recommit to ways and means
- Jun 1, 2011: print number 5713b
- Jun 1, 2011: amend and recommit to ways and means
- May 13, 2011: print number 5713a
- May 13, 2011: amend and recommit to ways and means
- Apr 13, 2011: reported referred to ways and means
- Mar 2, 2011: reference changed to energy
- Feb 25, 2011: referred to ways and means
A5713-2011 Text
S T A T E O F N E W Y O R K
________________________________________________________________________
5713
2011-2012 Regular Sessions
I N ASSEMBLY
February 25, 2011
___________
Introduced by M. of A. ENGLEBRIGHT, CAHILL, SCHIMEL, BRENNAN, ROSENTHAL,
CRESPO -- Multi-Sponsored by -- M. of A. BOYLE, HEASTIE, McENENY,
MILLMAN, RAIA, REILLY -- read once and referred to the Committee on
Ways and Means
AN ACT to amend the public service law and the public authorities law,
in relation to the creation of the New York solar industry development
and jobs act of 2011 and the procurement of solar renewable energy
credits; and providing for the repeal of such provisions upon expira-
tion thereof
THE PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND ASSEM-
BLY, DO ENACT AS FOLLOWS:
Section 1. Legislative intent and purpose. It is the intent of the
legislature to enable the rapid and sustainable development of a robust
solar power industry in New York by creating a scalable, diverse and
competitive solar energy market. By tapping into the state's abundant
solar energy resources, it is the further intent of the legislature to
harness the multiple benefits associated with the generation of such
clean power, including the significant creation of much needed jobs, a
reduction of the long-term costs of electricity generation for New
York's energy consumers, including transmission and distribution costs
that continue to accelerate in proportion to overall electricity supply
costs for the residents of this state, increased reliability of the
state's electric grid, and a decrease in the emission of harmful air
pollution, including localized emissions from "peaker" plants and green-
house gas emissions. By establishing such a program, New York will
create a solar energy enterprise that will elevate the state to be among
the world's cutting edge clean energy industry leaders, while helping to
secure increased economic development for New Yorkers.
S 2. Short title. This act shall be known and may be cited as the
"New York solar industry development and jobs act of 2011".
EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD08692-02-1
A. 5713 2
S 3. The public service law is amended by adding a new section 66-m to
read as follows:
S 66-M. PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS. 1. AS USED IN
THIS SECTION:
(A) "BUILDING INTEGRATED PHOTOVOLTAIC EQUIPMENT" MEANS A PHOTOVOLTAIC
DEVICE THAT DIRECTLY FUNCTIONS AS A PART OF THE ENVELOPE OF A BUILDING
INCLUDING INTEGRATED ROOF COVER, FACADE OR BUILDING CLADDING, GLAZED
SURFACES, SOLAR SHADING DEVICES, CANOPIES, AND SKYLIGHTS;
(B) "ELECTRIC DISTRIBUTION COMPANY" MEANS AN INVESTOR-OWNED UTILITY
THAT DISTRIBUTES ELECTRICITY WITHIN THIS STATE;
(C) "PHOTOVOLTAIC DEVICE" MEANS A SYSTEM OF COMPONENTS THAT GENERATES
ELECTRICITY FROM INCIDENTAL SUNLIGHT BY MEANS OF THE PHOTOVOLTAIC
EFFECT, WHETHER OR NOT THE DEVICE IS COUPLED WITH A DEVICE CAPABLE OF
STORING THE ENERGY PRODUCED FOR LATER USE;
(D) "QUALIFIED SOLAR ENERGY GENERATION" MEANS POWER GENERATED BY A
PHOTOVOLTAIC DEVICE THAT IS PLACED IN SERVICE WITHIN THE JURISDICTIONAL
BOUNDARIES OF THE STATE ON OR AFTER JANUARY FIRST, TWO THOUSAND TEN,
THAT IS NOT SUBJECT TO A POWER PURCHASE AGREEMENT;
(E) "QUALIFIED SOLAR ENERGY GENERATOR" MEANS THE OWNER OF A PHOTOVOL-
TAIC DEVICE OR DEVICES THAT PRODUCES QUALIFIED SOLAR ENERGY GENERATION;
(F) "RETAIL DISTRIBUTED SOLAR ENERGY GENERATION" MEANS QUALIFIED SOLAR
ENERGY GENERATION PRODUCED BY A PHOTOVOLTAIC DEVICE THAT IS INTERCON-
NECTED TO THE DISTRIBUTION SYSTEM ON THE CUSTOMER SIDE OF THE ELECTRIC
DISTRIBUTION COMPANY METER;
(G) "RETAIL ELECTRIC SUPPLIER" MEANS AN ENTITY AUTHORIZED TO SELL
ELECTRICITY AT RETAIL TO END-USE CUSTOMERS IN THIS STATE, INCLUDING AN
ELECTRIC DISTRIBUTION COMPANY ACTING AS A PROVIDER OF LAST RESORT OR AN
ENERGY SERVICE COMPANY LICENSED BY THE COMMISSION FOR SUCH PURPOSE;
(H) "SMALL RETAIL DISTRIBUTED SOLAR ENERGY GENERATION" MEANS RETAIL
DISTRIBUTED SOLAR ENERGY GENERATION PRODUCED BY A PHOTOVOLTAIC DEVICE
THAT IS EQUAL TO OR LESS THAN FIFTY KILOWATTS IN SIZE;
(I) "SOLAR ALTERNATIVE COMPLIANCE PAYMENT" MEANS A PAYMENT OF A
CERTAIN DOLLAR AMOUNT PER MEGAWATT-HOUR, AS ESTABLISHED BY THE COMMIS-
SION, THAT A RETAIL ELECTRIC SUPPLIER MAY SUBMIT TO THE COMMISSION IN
ORDER TO COMPLY WITH ITS ANNUAL OBLIGATIONS ESTABLISHED IN SUBDIVISION
TWO OF THIS SECTION;
(J) "SOLAR PURCHASE AGREEMENT" MEANS AN AGREEMENT, FOR A MINIMUM OF
FIFTEEN YEARS, FOR THE PURCHASE OF SRECS FROM A QUALIFIED SOLAR ENERGY
GENERATOR; AND
(K) "SOLAR RENEWABLE ENERGY CREDIT" OR "SREC" MEANS THE ENVIRONMENTAL
ATTRIBUTES ASSOCIATED WITH ONE MEGAWATT-HOUR OF QUALIFIED SOLAR ENERGY
GENERATION.
2. (A) EACH RETAIL ELECTRIC SUPPLIER SHALL ANNUALLY PROCURE, AT MINI-
MUM, SRECS TO MEET THE FOLLOWING PERCENTAGES OF SUCH SUPPLIER'S TOTAL
ELECTRIC SALES IN EACH COMPLIANCE YEAR:
COMPLIANCE ANNUAL
YEAR REQUIREMENT
2013 0.05%
2014 0.10%
2015 0.15%
2016 0.20%
2017 0.30%
2018 0.40%
2019 0.50%
2020 0.75%
2021 1.00%
A. 5713 3
2022 1.25%
2023 1.50%
2024 2.00%
2025 2.50%
(B) AT LEAST TWENTY PERCENT OF THE ANNUAL OBLIGATION APPLICABLE TO
EACH RETAIL ELECTRIC SUPPLIER THAT IS AN ELECTRIC DISTRIBUTION COMPANY
SHALL BE MET THROUGH THE PROCUREMENT OF SRECS ASSOCIATED WITH SMALL
RETAIL DISTRIBUTED SOLAR ENERGY GENERATION; AND AT LEAST AN ADDITIONAL
THIRTY PERCENT OF THE ANNUAL OBLIGATION APPLICABLE TO EACH RETAIL ELEC-
TRIC SUPPLIER THAT IS AN ELECTRIC DISTRIBUTION COMPANY SHALL BE MET
THROUGH THE PROCUREMENT OF SRECS ASSOCIATED WITH RETAIL DISTRIBUTED
SOLAR ENERGY GENERATION PRODUCED BY EQUIPMENT OF ANY SIZE.
(C) OBLIGATIONS FOR THE PROCUREMENT OF SRECS ASSOCIATED WITH QUALIFIED
SOLAR ENERGY GENERATION SHALL CONTINUE UNTIL ALL EXISTING SOLAR PURCHASE
AGREEMENTS HAVE EXPIRED.
(D) RETAIL ELECTRIC SUPPLIERS MAY MEET THEIR OBLIGATIONS ESTABLISHED
BY THE COMMISSION PURSUANT TO THIS SUBDIVISION THROUGH THE PROCUREMENT
OF SRECS TOGETHER WITH OR SEPARATE FROM THE ASSOCIATED QUALIFIED SOLAR
ENERGY GENERATION.
(E) THE COMMISSION, IN COORDINATION WITH THE NEW YORK STATE ENERGY
RESEARCH AND DEVELOPMENT AUTHORITY AND THE WHOLESALE GRID OPERATOR,
SHALL ESTABLISH AN AUTOMATED SREC TRACKING SYSTEM WITHIN THREE MONTHS OF
THE EFFECTIVE DATE OF THIS SECTION.
(F) SRECS SHALL BE ELIGIBLE FOR USE IN MEETING THE OBLIGATIONS ESTAB-
LISHED IN THIS SUBDIVISION IN THE COMPLIANCE YEAR IN WHICH THEY ARE
CREATED AND FOR THE FOLLOWING TWO COMPLIANCE YEARS.
3. (A) IN THE EVENT THAT RETAIL ELECTRIC SUPPLIERS CANNOT MEET THEIR
OBLIGATIONS ESTABLISHED IN SUBDIVISION TWO OF THIS SECTION, THEY SHALL
BE PERMITTED TO DISCHARGE SUCH OBLIGATIONS BY MAKING A SOLAR ALTERNATIVE
COMPLIANCE PAYMENT IN AN AMOUNT ESTABLISHED BY THE COMMISSION, PROVIDED,
HOWEVER, THAT THE COMMISSION SHALL SET SUCH PAYMENT AT A LEVEL THAT
SHALL STIMULATE THE DEVELOPMENT OF NEW QUALIFIED SOLAR ENERGY GENERATION
EQUIPMENT NECESSARY TO ACHIEVE THE OBLIGATIONS ESTABLISHED IN SUBDIVI-
SION TWO OF THIS SECTION.
(B) NO LATER THAN JANUARY FIRST, TWO THOUSAND TWELVE, THE COMMISSION
SHALL ESTABLISH A SOLAR ALTERNATIVE COMPLIANCE PAYMENT SCHEDULE THROUGH
THE YEAR TWO THOUSAND TWENTY-FIVE, AND SHALL ANNUALLY REVIEW SUCH SCHED-
ULE TO ENSURE THAT THE PAYMENTS ARE SET AT A LEVEL TO STIMULATE THE
DEVELOPMENT OF NEW QUALIFIED SOLAR ENERGY GENERATION EQUIPMENT, IN
ACCORDANCE WITH THE PREVIOUS SUBDIVISION. ONCE SUCH SCHEDULE IS ESTAB-
LISHED, THE COMMISSION MAY ADOPT, AFTER APPROPRIATE NOTICE AND OPPORTU-
NITY FOR PUBLIC COMMENT, AN INCREASE IN ALTERNATIVE COMPLIANCE PAYMENTS,
PROVIDED THAT THE COMMISSION SHALL NOT REDUCE PREVIOUSLY ESTABLISHED
LEVELS OF PAYMENTS, NOR SHALL THE COMMISSION PROVIDE RELIEF FROM THE
OBLIGATION OF PAYMENT OF THE SOLAR ALTERNATIVE COMPLIANCE PAYMENTS BY
THE RETAIL ELECTRIC SUPPLIERS IN ANY FORM.
(C) THE COMMISSION SHALL MAKE AVAILABLE ALL MONIES FROM AMOUNTS
COLLECTED THROUGH SUCH ALTERNATIVE COMPLIANCE PAYMENTS FOR SOLAR INITI-
ATIVES TO BE DEVELOPED BY THE NEW YORK STATE ENERGY RESEARCH AND DEVEL-
OPMENT AUTHORITY.
4. (A) NO LATER THAN JANUARY FIRST, TWO THOUSAND TWELVE, THE COMMIS-
SION SHALL ESTABLISH A TEMPLATE FOR SOLAR PURCHASE AGREEMENTS TO BE USED
BY RETAIL ELECTRIC SUPPLIERS THAT ARE ELECTRIC DISTRIBUTION COMPANIES
FOR THEIR PROCUREMENT OF SRECS FOR THE PURPOSE OF FULFILLING THEIR OBLI-
GATIONS ESTABLISHED IN SUBDIVISION TWO OF THIS SECTION.
A. 5713 4
(B) EACH RETAIL ELECTRIC SUPPLIER THAT IS AN ELECTRIC DISTRIBUTION
COMPANY SHALL, NOT LATER THAN JULY FIRST, TWO THOUSAND TWELVE, SUBMIT
FOR COMMISSION REVIEW AND APPROVAL A SOLAR SOLICITATION PLAN THAT SHALL
INCLUDE A TIMETABLE AND METHODOLOGY FOR SOLICITING PROPOSALS FOR SRECS
ASSOCIATED WITH QUALIFIED SOLAR ENERGY GENERATION OTHER THAN SMALL
RETAIL DISTRIBUTED SOLAR ENERGY GENERATION, FOR THE PURPOSE OF FULFILL-
ING ITS OBLIGATIONS ESTABLISHED IN SUBDIVISION TWO OF THIS SECTION. THE
ELECTRIC DISTRIBUTION COMPANY'S SOLAR SOLICITATION PLAN SHALL BE
DESIGNED TO FOSTER A DIVERSITY OF SOLAR PROJECT SIZES AND PARTICIPATION
AMONG ALL ELIGIBLE CUSTOMER CLASSES SUBJECT TO COST-EFFECTIVENESS
CONSIDERATIONS. A SEPARATE SOLICITATION PROCESS SHALL BE CONDUCTED FOR
THE PROCUREMENTS OF SRECS ASSOCIATED WITH RETAIL DISTRIBUTED SOLAR ENER-
GY GENERATION PRODUCED BY EQUIPMENT THAT IS BETWEEN FIFTY-ONE AND TWO
HUNDRED FIFTY KILOWATTS IN SIZE.
(C) EACH RETAIL ELECTRIC SUPPLIER THAT IS AN ELECTRIC DISTRIBUTION
COMPANY SHALL EXECUTE ITS APPROVED SOLICITATION PLAN AND SUBMIT FOR
COMMISSION REVIEW AND APPROVAL ITS PREFERRED SOLAR PROCUREMENT PLAN
COMPRISED OF PROPOSED SOLAR PURCHASE AGREEMENTS FOR SRECS ASSOCIATED
WITH QUALIFIED SOLAR ENERGY GENERATION OTHER THAN SMALL RETAIL DISTRIB-
UTED SOLAR ENERGY GENERATION. THE COMMISSION MAY APPROVE, REJECT OR
MODIFY AN APPLICATION FOR APPROVAL OF SUCH PLAN, PROVIDED THAT THE
COMMISSION SHALL APPROVE SUCH PLAN IF THE COMMISSION FINDS THAT: (I) THE
SOLICITATION AND EVALUATION CONDUCTED BY THE ELECTRIC DISTRIBUTION
COMPANY WAS THE RESULT OF A FAIR, OPEN, COMPETITIVE AND TRANSPARENT
PROCESS; (II) APPROVAL OF THE SOLAR PROCUREMENT PLAN WOULD RESULT IN THE
ACHIEVEMENT OF THE DISTRIBUTION COMPANY'S OBLIGATIONS PERTAINING TO THE
PROCUREMENT OF SRECS ASSOCIATED WITH QUALIFIED SOLAR ENERGY GENERATION
OTHER THAN SMALL RETAIL DISTRIBUTED SOLAR ENERGY GENERATION AT THE
LOWEST REASONABLE COST; AND (III) SUCH PROCUREMENT PLAN SATISFIES OTHER
CRITERIA AS MAY BE ESTABLISHED IN THE APPROVED SOLICITATION PLAN. IF THE
COMMISSION DOES NOT APPROVE, REJECT OR MODIFY THE DISTRIBUTION COMPANY'S
APPLICATION WITHIN SIXTY DAYS, THE PROCUREMENT PLAN SHALL BE DEEMED
APPROVED.
(D) NO LATER THAN JULY FIRST, TWO THOUSAND TWELVE, EACH RETAIL ELEC-
TRIC SUPPLIER THAT IS AN ELECTRIC DISTRIBUTION COMPANY SHALL SUBMIT TO
THE COMMISSION FOR REVIEW AND APPROVAL A PLAN FOR THE ACHIEVEMENT OF ITS
OBLIGATION PERTAINING TO THE PROCUREMENT OF SRECS ASSOCIATED WITH SMALL
RETAIL DISTRIBUTED SOLAR ENERGY GENERATION ESTABLISHED IN SUBDIVISION
TWO OF THIS SECTION.
5. EACH RETAIL ELECTRIC SUPPLIER THAT IS AN ELECTRIC DISTRIBUTION
COMPANY SHALL BE ENTITLED TO RECOVER THE PRUDENTLY INCURRED COSTS OF
COMPLYING WITH ITS OBLIGATIONS ESTABLISHED IN SUBDIVISION TWO OF THIS
SECTION, AS DETERMINED BY THE COMMISSION. ALL SUCH COSTS SHALL BE RECOV-
ERED THROUGH THE SUPPLY PORTION OF EACH ELECTRIC CUSTOMER'S BILL IN A
COMPETITIVELY NEUTRAL MANNER.
6. NO LATER THAN JULY FIRST, TWO THOUSAND TWELVE, THE COMMISSION SHALL
ESTABLISH AN INCENTIVE PROGRAM FOR RETAIL ELECTRIC SUPPLIERS THAT ARE
ELECTRIC DISTRIBUTION COMPANIES BASED ON SUCH COMPANIES' ACHIEVEMENT OF
THEIR OBLIGATIONS, AND EXEMPLARY PERFORMANCE BEYOND SUCH OBLIGATIONS,
ESTABLISHED IN SUBDIVISION TWO OF THIS SECTION (I) IN A COST-EFFECTIVE
MANNER THAT ACHIEVES THE OBLIGATIONS AT LEAST COST AND AVOIDS LONG-TERM
COSTS TO THE TRANSMISSION AND DISTRIBUTION SYSTEM; (II) PROVIDES
ENHANCED ELECTRICITY RELIABILITY WITHIN COMPANIES' SERVICE TERRITORIES;
AND (III) MINIMIZES PEAK LOAD IN CONSTRAINED AREAS.
7. NO LATER THAN JANUARY FIRST, TWO THOUSAND TWELVE, THE COMMISSION
SHALL, IN CONSULTATION WITH THE NEW YORK STATE ENERGY RESEARCH AND
A. 5713 5
DEVELOPMENT AUTHORITY, ESTABLISH THE TERMS AND CONDITIONS THAT SHALL BE
APPLICABLE TO SOLAR PURCHASE AGREEMENTS ENTERED INTO BY RETAIL ELECTRIC
SUPPLIERS THAT ARE ELECTRIC DISTRIBUTION COMPANIES FOR THE PROCUREMENT
OF SRECS ASSOCIATED WITH SMALL RETAIL DISTRIBUTED SOLAR ENERGY GENER-
ATION, FOR THE PURPOSE OF ACHIEVING SUCH COMPANIES' OBLIGATIONS PERTAIN-
ING TO SRECS ASSOCIATED WITH SUCH GENERATION ESTABLISHED IN SUBDIVISION
TWO OF THIS SECTION. SUCH TERMS AND CONDITIONS SHALL INCLUDE A TARIFF,
AS ESTABLISHED BY THE COMMISSION IN CONJUNCTION WITH THE NEW YORK STATE
ENERGY RESEARCH AND DEVELOPMENT AUTHORITY, FOR THE PROCUREMENT OF SRECS
ASSOCIATED WITH SMALL RETAIL DISTRIBUTED SOLAR ENERGY GENERATION, TO BE
PAID BY ELECTRIC DISTRIBUTION COMPANIES TO APPLICABLE QUALIFIED SOLAR
ENERGY GENERATORS. THE COMMISSION, IN CONJUNCTION WITH THE NEW YORK
STATE ENERGY RESEARCH AND DEVELOPMENT AUTHORITY, SHALL ESTABLISH A SEPA-
RATE TARIFF FOR THE PROCUREMENT OF SRECS ASSOCIATED WITH SMALL RETAIL
DISTRIBUTED SOLAR ENERGY GENERATION THAT IS PRODUCED BY BUILDING INTE-
GRATED PHOTOVOLTAIC EQUIPMENT, WHICH SHALL BE EQUIVALENT TO ONE HUNDRED
TWENTY-FIVE PERCENT OF THE TARIFF APPLICABLE TO SRECS ASSOCIATED WITH
OTHER SOURCES OF SMALL RETAIL DISTRIBUTED SOLAR ENERGY GENERATION. THE
COMMISSION, IN CONJUNCTION WITH THE NEW YORK STATE ENERGY RESEARCH AND
DEVELOPMENT AUTHORITY, SHALL REVIEW SUCH TARIFFS EVERY TWO YEARS AND
ADJUST AS NECESSARY TO ACHIEVE THE OBLIGATIONS PERTAINING TO SRECS ASSO-
CIATED WITH SMALL RETAIL DISTRIBUTED SOLAR ENERGY GENERATION ESTABLISHED
IN SUBDIVISION TWO OF THIS SECTION.
8. RETAIL CONTRACTS FOR THE SALE OF ELECTRICITY ENTERED INTO BEFORE
JANUARY FIRST, TWO THOUSAND THIRTEEN BY RETAIL ELECTRIC SUPPLIERS THAT
ARE NOT ELECTRIC DISTRIBUTION COMPANIES SHALL BE EXEMPT FROM THE OBLI-
GATIONS ESTABLISHED IN SUBDIVISION TWO OF THIS SECTION.
9. EACH RETAIL ELECTRIC SUPPLIER THAT IS AN ELECTRIC DISTRIBUTION
COMPANY SHALL BE PERMITTED TO CONSTRUCT, OWN AND OPERATE QUALIFIED SOLAR
ENERGY GENERATION EQUIPMENT FOR THE PURPOSE OF COMPLYING WITH THE COMPA-
NY'S OBLIGATIONS ESTABLISHED IN SUBDIVISION TWO OF THIS SECTION;
PROVIDED, HOWEVER, THAT THE SRECS ASSOCIATED WITH THE QUALIFIED SOLAR
ENERGY GENERATION PRODUCED BY SUCH EQUIPMENT SHALL NOT, IN THE AGGRE-
GATE, COMPRISE GREATER THAN TWENTY-FIVE PERCENT OF SUCH COMPANY'S OBLI-
GATIONS, AS ESTABLISHED IN SUBDIVISION TWO OF THIS SECTION, IN ANY
CALENDAR YEAR. NO ELECTRIC DISTRIBUTION COMPANY MAY RECOVER PRUDENTLY
INCURRED COSTS ASSOCIATED WITH THE CONSTRUCTION OF QUALIFIED SOLAR ENER-
GY GENERATION EQUIPMENT WITHOUT OBTAINING PRIOR APPROVAL FOR THE COSTS
FROM THE COMMISSION.
10. EACH RETAIL ELECTRIC SUPPLIER THAT IS AN ELECTRIC DISTRIBUTION
COMPANY SHALL BE PERMITTED TO RESELL OR OTHERWISE DISPOSE OF SRECS AND
ANY ASSOCIATED QUALIFIED SOLAR ENERGY GENERATION PROCURED BY SUCH COMPA-
NY THAT IS IN EXCESS OF ITS OBLIGATIONS ESTABLISHED IN SUBDIVISION TWO
OF THIS SECTION, PROVIDED THE COMPANY SHALL NET THE COST OF PAYMENTS
MADE FOR SRECS AND ANY ASSOCIATED QUALIFIED SOLAR ENERGY GENERATION
UNDER SOLAR PURCHASE AGREEMENTS AGAINST THE PROCEEDS OF THE SALE OF
SRECS AND ANY ASSOCIATED QUALIFIED SOLAR ENERGY GENERATION, AND THE
DIFFERENCE SHALL BE CREDITED OR CHARGED TO THE ELECTRIC DISTRIBUTION
COMPANY'S CUSTOMERS THROUGH A RECONCILING COMPONENT OF ELECTRIC RATES,
AS DETERMINED BY THE COMMISSION.
11. (A) WITHIN THIRTY DAYS OF THE SUBMISSION OF THE ANNUAL COMPLIANCE
REPORTS FILED BY RETAIL ELECTRIC SUPPLIERS PURSUANT TO SUBDIVISION
TWELVE OF THIS SECTION, THE COMMISSION SHALL DETERMINE THE COMBINED
TOTAL ANNUAL EXPENDITURES FOR THE PROCUREMENT OF SRECS MADE BY RETAIL
ELECTRIC SUPPLIERS FOR THE PURPOSES OF MEETING THE ANNUAL REQUIREMENT
SET FORTH IN PARAGRAPH (A) OF SUBDIVISION TWO OF THIS SECTION FOR THE
A. 5713 6
APPLICABLE COMPLIANCE YEAR AS A PERCENTAGE OF THE TOTAL RETAIL ELECTRIC-
ITY SALES REVENUES FOR RETAIL ELECTRIC SUPPLIERS FOR SUCH COMPLIANCE
YEAR. IF SUCH PERCENTAGE EXCEEDS ONE AND ONE-HALF PERCENT, THEN THE
ANNUAL REQUIREMENT FOR THE COMPLIANCE YEAR FOR WHICH THE COMMISSION
MAKES ITS DETERMINATION SHALL CONTINUE TO BE THE ANNUAL REQUIREMENT
APPLICABLE IN EACH SUBSEQUENT COMPLIANCE YEAR UNTIL THIS LIMITATION ENDS
AS PROVIDED IN PARAGRAPH (B) OF THIS SUBDIVISION.
(B) IF THE LIMITATION PROVIDED FOR IN PARAGRAPH (A) OF THIS SUBDIVI-
SION IS TRIGGERED, IT SHALL END UPON A DETERMINATION BY THE COMMISSION,
BASED UPON A REVIEW OF THE RETAIL ELECTRIC SUPPLIERS' ANNUAL COMPLIANCE
REPORTS, THAT THE COMBINED TOTAL ANNUAL EXPENDITURES FOR THE PROCUREMENT
OF SRECS MADE BY RETAIL ELECTRIC SUPPLIERS TO MEET THE APPLICABLE ANNUAL
REQUIREMENT FOR A COMPLIANCE YEAR DID NOT EXCEED ONE AND ONE-HALF
PERCENT OF THE TOTAL RETAIL ELECTRICITY SALES REVENUES FOR RETAIL ELEC-
TRIC SUPPLIERS FOR SUCH COMPLIANCE YEAR. FOR THE COMPLIANCE YEAR IMME-
DIATELY FOLLOWING THE END OF THE LIMITATION PURSUANT TO THIS PARAGRAPH,
THE APPLICABLE ANNUAL REQUIREMENT SHALL BE THE REQUIREMENT SET FORTH IN
PARAGRAPH (A) OF SUBDIVISION TWO OF THIS SECTION FOR THE COMPLIANCE YEAR
IMMEDIATELY FOLLOWING THE COMPLIANCE YEAR FOR WHICH THE LIMITATION IN
PARAGRAPH (A) OF THIS SUBDIVISION WAS TRIGGERED. THE ANNUAL REQUIREMENT
SHALL CONTINUE TO INCREASE IN THE INCREMENTS PROVIDED FOR IN PARAGRAPH
(A) OF SUBDIVISION TWO OF THIS SECTION FOR EACH SUBSEQUENT YEAR UNTIL
THE ANNUAL REQUIREMENT REACHES THE PERCENTAGE SET FORTH IN SUCH PARA-
GRAPH FOR COMPLIANCE YEAR TWO THOUSAND TWENTY-FIVE.
(C) SOLAR ALTERNATIVE COMPLIANCE PAYMENTS MADE BY RETAIL ELECTRIC
SUPPLIERS PURSUANT TO SUBDIVISION THREE OF THIS SECTION SHALL NOT COUNT
TOWARDS THE ANNUAL EXPENDITURE LIMITATIONS SET FORTH IN PARAGRAPH (A) OF
THIS SUBDIVISION.
12. (A) NO LATER THAN JULY FIRST, TWO THOUSAND FOURTEEN, AND NO LATER
THAN JULY FIRST OF EACH YEAR THEREAFTER THROUGH THE YEAR TWO THOUSAND
TWENTY-SIX THE COMMISSION SHALL REPORT TO THE GOVERNOR, SPEAKER OF THE
ASSEMBLY, TEMPORARY PRESIDENT OF THE SENATE, AND CHAIRS OF THE SENATE
AND ASSEMBLY ENERGY COMMITTEES, AND SHALL POST ON ITS WEBSITE, A REPORT
REGARDING THE PROGRESS OF EACH RETAIL ELECTRIC SUPPLIER IN MEETING ITS
OBLIGATIONS ESTABLISHED IN SUBDIVISION TWO OF THIS SECTION.
(B) EACH RETAIL ELECTRIC SUPPLIER SHALL PROVIDE TO THE COMMISSION THE
INFORMATION NECESSARY TO FULFILL THE COMMISSION'S OBLIGATIONS PURSUANT
TO THIS SUBDIVISION, IN ACCORDANCE WITH AN ANNUAL REPORTING OBLIGATION
AND PROCESS TO BE ESTABLISHED BY THE COMMISSION.
(C) EACH REPORT THAT SHALL BE SUBMITTED PURSUANT TO THIS SUBDIVISION
SHALL INCLUDE, BUT NOT BE LIMITED TO, FOR EACH RETAIL ELECTRIC SUPPLIER
FOR THE PREVIOUS CALENDAR YEAR AND FOR THE TOTAL OF ALL CALENDAR YEARS
TO DATE: (I) THE ACTUAL NUMBER OF MEGAWATT-HOURS OF QUALIFIED SOLAR
ENERGY GENERATION SOLD AT RETAIL TO NEW YORK END-USE CUSTOMERS AND THE
TOTAL NUMBER OF MEGAWATT-HOURS SOLD AT RETAIL TO NEW YORK END-USE
CUSTOMERS; (II) THE NUMBER OF SRECS ASSOCIATED WITH QUALIFIED SOLAR
ENERGY GENERATION THAT WERE RETIRED FOR THE PURPOSES OF MEETING THE
SUPPLIER'S OBLIGATIONS ESTABLISHED IN SUBDIVISION TWO OF THIS SECTION;
(III) THE AMOUNT, IF ANY, OF SOLAR ALTERNATIVE COMPLIANCE PAYMENTS MADE;
AND (IV) ITS ANNUAL RETAIL ELECTRICITY SALES REVENUE AND EXPENDITURES
FOR THE PROCUREMENT OF SRECS MADE FOR THE PURPOSES OF MEETING THE APPLI-
CABLE ANNUAL REQUIREMENT, PROVIDED THAT SUCH INFORMATION NEED ONLY BE
REPORTED FOR THE PREVIOUS CALENDAR YEAR. SUCH REPORT SHALL ALSO
INCLUDE, FOR EACH RETAIL ELECTRIC SUPPLIER THAT IS AN ELECTRIC DISTRIB-
UTION COMPANY: (1) THE NUMBER OF SRECS EACH ASSOCIATED WITH SMALL RETAIL
DISTRIBUTED SOLAR ENERGY GENERATION, RETAIL DISTRIBUTED SOLAR ENERGY
A. 5713 7
GENERATION PRODUCED BY EQUIPMENT THAT IS BETWEEN FIFTY-ONE AND TWO
HUNDRED FIFTY KILOWATTS IN SIZE AND RETAIL DISTRIBUTED SOLAR ENERGY
GENERATION PRODUCED BY EQUIPMENT OF ANY SIZE THAT WERE PROCURED; (2) THE
NUMBER OF SUCH SRECS PROCURED THROUGH SOLAR PURCHASE AGREEMENTS AND THE
ELECTRIC DISTRIBUTION COMPANY'S OWNERSHIP OF QUALIFIED SOLAR ENERGY
GENERATION EQUIPMENT, RESPECTIVELY; AND (3) THE AMOUNT PAID TO QUALIFIED
SOLAR ENERGY GENERATORS THROUGH TARIFFS ESTABLISHED PURSUANT TO SUBDIVI-
SION SEVEN OF THIS SECTION FOR SRECS ASSOCIATED WITH SMALL RETAIL
DISTRIBUTED SOLAR ENERGY GENERATION.
S 4. Section 1005 of the public authorities law is amended by adding a
new subdivision 17 to read as follows:
17. A. FOR THE PURPOSES OF THIS SUBDIVISION, THE FOLLOWING TERMS SHALL
HAVE THE FOLLOWING MEANINGS:
(1) "PHOTOVOLTAIC DEVICE" MEANS A SYSTEM OF COMPONENTS THAT GENERATES
ELECTRICITY FROM INCIDENTAL SUNLIGHT BY MEANS OF THE PHOTOVOLTAIC
EFFECT, WHETHER OR NOT THE DEVICE IS COUPLED WITH A DEVICE CAPABLE OF
STORING THE ENERGY PRODUCED FOR LATER USE;
(2) "QUALIFIED SOLAR ENERGY GENERATION" MEANS POWER GENERATED BY A
PHOTOVOLTAIC DEVICE THAT IS PLACED IN SERVICE WITHIN THE JURISDICTIONAL
BOUNDARIES OF THE STATE ON OR AFTER JANUARY FIRST, TWO THOUSAND TEN,
THAT IS NOT SUBJECT TO A POWER PURCHASE AGREEMENT;
(3) "QUALIFIED SOLAR ENERGY GENERATOR" MEANS THE OWNER OF A PHOTOVOL-
TAIC DEVICE OR DEVICES THAT PRODUCES QUALIFIED SOLAR ENERGY GENERATION;
(4) "RETAIL DISTRIBUTED SOLAR ENERGY GENERATION" MEANS QUALIFIED SOLAR
ENERGY GENERATION PRODUCED BY A PHOTOVOLTAIC DEVICE THAT IS INTERCON-
NECTED TO THE DISTRIBUTION SYSTEM ON THE CUSTOMER SIDE OF THE ELECTRIC
DISTRIBUTION COMPANY METER;
(5) "SMALL RETAIL DISTRIBUTED SOLAR ENERGY GENERATION" MEANS RETAIL
DISTRIBUTED SOLAR ENERGY GENERATION PRODUCED BY A PHOTOVOLTAIC DEVICE
THAT IS EQUAL TO OR LESS THAN FIFTY KILOWATTS IN SIZE;
(6) "SOLAR PURCHASE AGREEMENT" MEANS AN AGREEMENT, FOR A MINIMUM OF
FIFTEEN YEARS, FOR THE PURCHASE OF SRECS FROM A QUALIFIED SOLAR ENERGY
GENERATOR; AND
(7) "SOLAR RENEWABLE ENERGY CREDIT" OR "SREC" MEANS THE ENVIRONMENTAL
ATTRIBUTES ASSOCIATED WITH ONE MEGAWATT-HOUR OF QUALIFIED SOLAR ENERGY
GENERATION.
B. (1) THE AUTHORITY SHALL ANNUALLY PROCURE, AT MINIMUM, SRECS TO MEET
THE FOLLOWING PERCENTAGES OF THE AUTHORITY'S TOTAL ELECTRIC SALES IN
EACH COMPLIANCE YEAR:
COMPLIANCE ANNUAL
YEAR REQUIREMENT
2013 0.25%
2014 0.55%
2015 0.70%
2016 0.90%
2017 1.10%
2018 1.30%
2019 1.50%
2020 1.75%
2021 2.00%
2022 2.50%
2023 3.00%
2024 3.50%
2025 4.50%
(2) AT LEAST TWENTY PERCENT OF THE ANNUAL OBLIGATION ESTABLISHED IN
THIS PARAGRAPH SHALL BE MET THROUGH THE PROCUREMENT OF SRECS ASSOCIATED
A. 5713 8
WITH SMALL RETAIL DISTRIBUTED SOLAR ENERGY GENERATION; AND AT LEAST AN
ADDITIONAL THIRTY PERCENT OF THE ANNUAL OBLIGATION ESTABLISHED IN THIS
PARAGRAPH SHALL BE MET THROUGH THE PROCUREMENT OF SRECS ASSOCIATED WITH
RETAIL DISTRIBUTED SOLAR ENERGY GENERATION PRODUCED BY EQUIPMENT OF ANY
SIZE.
(3) OBLIGATIONS FOR THE PROCUREMENT OF SRECS ASSOCIATED WITH QUALIFIED
SOLAR ENERGY GENERATION SHALL CONTINUE UNTIL ALL EXISTING SOLAR PURCHASE
AGREEMENTS HAVE EXPIRED.
(4) THE AUTHORITY MAY MEET ITS OBLIGATIONS ESTABLISHED IN THIS PARA-
GRAPH THROUGH THE PROCUREMENT OF SRECS TOGETHER WITH OR SEPARATE FROM
THE ASSOCIATED QUALIFIED SOLAR ENERGY GENERATION.
C. (1) NO LATER THAN JULY FIRST, TWO THOUSAND TWELVE, THE AUTHORITY
SHALL SUBMIT TO THE GOVERNOR, SPEAKER OF THE ASSEMBLY, TEMPORARY PRESI-
DENT OF THE SENATE, AND CHAIRS OF THE SENATE AND ASSEMBLY ENERGY COMMIT-
TEES, AND SHALL POST ON ITS WEBSITE, A SOLAR SOLICITATION PLAN THAT
SHALL INCLUDE A TIMETABLE AND METHODOLOGY FOR SOLICITING PROPOSALS FOR
SRECS ASSOCIATED WITH QUALIFIED SOLAR ENERGY GENERATION OTHER THAN SMALL
RETAIL DISTRIBUTED SOLAR ENERGY GENERATION, FOR THE PURPOSE OF FULFILL-
ING ITS OBLIGATIONS ESTABLISHED IN PARAGRAPH B OF THIS SUBDIVISION. THE
AUTHORITY'S SOLAR SOLICITATION PLAN SHALL BE DESIGNED TO FOSTER A DIVER-
SITY OF SOLAR PROJECT SIZES AND PARTICIPATION AMONG ALL ELIGIBLE CUSTOM-
ER CLASSES SUBJECT TO COST-EFFECTIVENESS CONSIDERATIONS. A SEPARATE
SOLICITATION PROCESS SHALL BE CONDUCTED FOR THE PROCUREMENT OF SRECS
ASSOCIATED WITH RETAIL DISTRIBUTED SOLAR ENERGY GENERATION PRODUCED BY
EQUIPMENT THAT IS BETWEEN FIFTY-ONE AND TWO HUNDRED FIFTY KILOWATTS IN
SIZE.
(2) THE AUTHORITY SHALL EXECUTE ITS SOLICITATION PLAN AND SHALL SUBMIT
TO THE COMPTROLLER, GOVERNOR, SPEAKER OF THE ASSEMBLY, TEMPORARY PRESI-
DENT OF THE SENATE, AND CHAIRS OF THE SENATE AND ASSEMBLY ENERGY COMMIT-
TEES, AND SHALL POST ON ITS WEBSITE, ITS SOLAR PROCUREMENT PLAN
COMPRISED OF ANY SOLAR PURCHASE AGREEMENTS FOR SRECS ASSOCIATED WITH
QUALIFIED SOLAR ENERGY GENERATION OTHER THAN SMALL RETAIL DISTRIBUTED
SOLAR ENERGY GENERATION. THE COMPTROLLER SHALL REVIEW SUCH PLAN TO
ASSESS WHETHER IT IS THE RESULT OF A FAIR, OPEN, COMPETITIVE AND TRANS-
PARENT PROCESS AND SHALL REPORT TO THE GOVERNOR, SPEAKER OF THE ASSEM-
BLY, TEMPORARY PRESIDENT OF THE SENATE, AND CHAIRS OF THE SENATE AND
ASSEMBLY ENERGY COMMITTEES REGARDING THE RESULTS OF SUCH ASSESSMENT.
(3) NO LATER THAN JULY FIRST, TWO THOUSAND TWELVE, THE AUTHORITY SHALL
SUBMIT TO THE GOVERNOR, SPEAKER OF THE ASSEMBLY, TEMPORARY PRESIDENT OF
THE SENATE, AND CHAIRS OF THE SENATE AND ASSEMBLY ENERGY COMMITTEES, AND
SHALL POST ON ITS WEBSITE, A PLAN FOR THE ACHIEVEMENT OF ITS OBLIGATION
PERTAINING TO THE PROCUREMENT OF SRECS ASSOCIATED WITH SMALL RETAIL
DISTRIBUTED SOLAR ENERGY GENERATION ESTABLISHED IN PARAGRAPH B OF THIS
SUBDIVISION.
D. (1) NO LATER THAN JULY FIRST, TWO THOUSAND FOURTEEN, AND NO LATER
THAN JULY FIRST OF EACH YEAR THEREAFTER THROUGH THE YEAR TWO THOUSAND
TWENTY-SIX, THE AUTHORITY SHALL REPORT TO THE GOVERNOR, SPEAKER OF THE
ASSEMBLY, MAJORITY LEADER OF THE SENATE, AND CHAIRS OF THE SENATE AND
ASSEMBLY ENERGY COMMITTEES, AND SHALL POST ON ITS WEBSITE, A REPORT
REGARDING ITS PROGRESS IN MEETING ITS OBLIGATIONS ESTABLISHED IN PARA-
GRAPH B OF THIS SUBDIVISION.
(2) EACH REPORT THAT SHALL BE SUBMITTED PURSUANT TO THIS PARAGRAPH
SHALL INCLUDE, BUT NOT BE LIMITED TO, FOR THE PREVIOUS CALENDAR YEAR AND
FOR THE TOTAL OF ALL CALENDAR YEARS TO DATE: (I) THE NUMBER OF SRECS
ASSOCIATED WITH QUALIFIED SOLAR ENERGY GENERATION RETIRED FOR THE
PURPOSES OF MEETING THE AUTHORITY'S OBLIGATIONS ESTABLISHED IN PARAGRAPH
A. 5713 9
B OF THIS SUBDIVISION; (II) THE NUMBER OF SUCH SRECS EACH ASSOCIATED
WITH SMALL RETAIL DISTRIBUTED SOLAR ENERGY GENERATION, RETAIL DISTRIB-
UTED SOLAR ENERGY GENERATION PRODUCED BY EQUIPMENT THAT IS BETWEEN
FIFTY-ONE AND TWO HUNDRED FIFTY KILOWATTS IN SIZE AND RETAIL DISTRIBUTED
SOLAR ENERGY GENERATION PRODUCED BY EQUIPMENT OF ANY SIZE THAT WERE
PROCURED; AND (III) THE NUMBER OF SUCH SRECS PROCURED THROUGH SOLAR
PURCHASE AGREEMENTS AND THE AUTHORITY'S OWNERSHIP OF QUALIFIED SOLAR
ENERGY GENERATION EQUIPMENT, RESPECTIVELY.
S 5. Sections 1020-hh, 1020-ii and 1020-jj of the public authorities
law, as renumbered by chapter 433 of the laws of 2009, are renumbered
sections 1020-ii, 1020-jj and 1020-kk and a new section 1020-hh is added
to read as follows:
S 1020-HH. PROCUREMENT OF SOLAR RENEWABLE ENERGY CREDITS. 1. AS USED
IN THIS SECTION:
(A) "BUILDING INTEGRATED PHOTOVOLTAIC EQUIPMENT" MEANS A PHOTOVOLTAIC
DEVICE THAT DIRECTLY FUNCTIONS AS A PART OF THE ENVELOPE OF A BUILDING
INCLUDING INTEGRATED ROOF COVER, FACADE OR BUILDING CLADDING, GLAZED
SURFACES, SOLAR SHADING DEVICES, CANOPIES AND SKYLIGHTS;
(B) "PHOTOVOLTAIC DEVICE" MEANS A SYSTEM OF COMPONENTS THAT GENERATES
ELECTRICITY FROM INCIDENTAL SUNLIGHT BY MEANS OF THE PHOTOVOLTAIC
EFFECT, WHETHER OR NOT THE DEVICE IS COUPLED WITH A DEVICE CAPABLE OF
STORING THE ENERGY PRODUCED FOR LATER USE;
(C) "QUALIFIED SOLAR ENERGY GENERATION" MEANS POWER GENERATED BY A
PHOTOVOLTAIC DEVICE THAT IS PLACED IN SERVICE WITHIN THE JURISDICTIONAL
BOUNDARIES OF THE STATE ON OR AFTER JANUARY FIRST, TWO THOUSAND TEN,
THAT IS NOT SUBJECT TO A POWER PURCHASE AGREEMENT;
(D) "QUALIFIED SOLAR ENERGY GENERATOR" MEANS THE OWNER OF A PHOTOVOL-
TAIC DEVICE OR DEVICES THAT PRODUCES QUALIFIED SOLAR ENERGY GENERATION;
(E) "RETAIL DISTRIBUTED SOLAR ENERGY GENERATION" MEANS QUALIFIED SOLAR
ENERGY GENERATION PRODUCED BY A PHOTOVOLTAIC DEVICE THAT IS INTERCON-
NECTED TO THE DISTRIBUTION SYSTEM ON THE CUSTOMER SIDE OF THE ELECTRIC
DISTRIBUTION COMPANY METER;
(F) "SMALL RETAIL DISTRIBUTED SOLAR ENERGY GENERATION" MEANS RETAIL
DISTRIBUTED SOLAR ENERGY GENERATION PRODUCED BY A PHOTOVOLTAIC DEVICE
THAT IS EQUAL TO OR LESS THAN FIFTY KILOWATTS IN SIZE;
(G) "SOLAR PURCHASE AGREEMENT" MEANS AN AGREEMENT, FOR A MINIMUM OF
FIFTEEN YEARS, FOR THE PURCHASE OF SRECS FROM A QUALIFIED SOLAR ENERGY
GENERATOR; AND
(H) "SOLAR RENEWABLE ENERGY CREDIT" OR "SREC" MEANS THE ENVIRONMENTAL
ATTRIBUTES ASSOCIATED WITH ONE MEGAWATT-HOUR OF QUALIFIED SOLAR ENERGY
GENERATION.
2. (A) THE AUTHORITY SHALL ANNUALLY PROCURE, AT MINIMUM, SRECS TO MEET
THE FOLLOWING PERCENTAGES OF THE AUTHORITY'S TOTAL ELECTRIC SALES IN
EACH COMPLIANCE YEAR:
COMPLIANCE ANNUAL
YEAR REQUIREMENT
2013 0.25%
2014 0.55%
2015 0.70%
2016 0.90%
2017 1.10%
2018 1.30%
2019 1.50%
2020 1.75%
2021 2.00%
2022 2.50%
A. 5713 10
2023 3.00%
2024 3.50%
2025 4.50%
(B) AT LEAST TWENTY PERCENT OF THE ANNUAL OBLIGATION ESTABLISHED IN
THIS SUBDIVISION SHALL BE MET THROUGH THE PROCUREMENT OF SRECS ASSOCI-
ATED WITH SMALL RETAIL DISTRIBUTED SOLAR ENERGY GENERATION; AND AT LEAST
AN ADDITIONAL THIRTY PERCENT OF THE ANNUAL OBLIGATION ESTABLISHED IN
THIS SUBDIVISION SHALL BE MET THROUGH THE PROCUREMENT OF SRECS ASSOCI-
ATED WITH RETAIL DISTRIBUTED SOLAR ENERGY GENERATION PRODUCED BY EQUIP-
MENT OF ANY SIZE.
(C) OBLIGATIONS FOR THE PROCUREMENT OF SRECS ASSOCIATED WITH QUALIFIED
SOLAR ENERGY GENERATION SHALL CONTINUE UNTIL ALL EXISTING SOLAR PURCHASE
AGREEMENTS HAVE EXPIRED.
(D) THE AUTHORITY MAY MEET ITS OBLIGATIONS ESTABLISHED IN THIS SUBDI-
VISION THROUGH THE PROCUREMENT OF SRECS TOGETHER WITH OR SEPARATE FROM
THE ASSOCIATED QUALIFIED SOLAR ENERGY GENERATION.
3. (A) NO LATER THAN JULY FIRST, TWO THOUSAND TWELVE, THE AUTHORITY
SHALL SUBMIT TO THE GOVERNOR, SPEAKER OF THE ASSEMBLY, TEMPORARY PRESI-
DENT OF THE SENATE, AND CHAIRS OF THE SENATE AND ASSEMBLY ENERGY COMMIT-
TEES, AND SHALL POST ON ITS WEBSITE, A SOLAR SOLICITATION PLAN THAT
SHALL INCLUDE A TIMETABLE AND METHODOLOGY FOR SOLICITING PROPOSALS FOR
SRECS ASSOCIATED WITH QUALIFIED SOLAR ENERGY GENERATION OTHER THAN SMALL
RETAIL DISTRIBUTED SOLAR ENERGY GENERATION, FOR THE PURPOSE OF FULFILL-
ING ITS OBLIGATIONS ESTABLISHED IN SUBDIVISION TWO OF THIS SECTION. THE
AUTHORITY'S SOLAR SOLICITATION PLAN SHALL BE DESIGNED TO FOSTER A DIVER-
SITY OF SOLAR PROJECT SIZES AND PARTICIPATION AMONG ALL ELIGIBLE CUSTOM-
ER CLASSES SUBJECT TO COST-EFFECTIVENESS CONSIDERATIONS. A SEPARATE
SOLICITATION PROCESS SHALL BE CONDUCTED FOR THE PROCUREMENT OF SRECS
ASSOCIATED WITH RETAIL DISTRIBUTED SOLAR ENERGY GENERATION PRODUCED BY
EQUIPMENT THAT IS BETWEEN FIFTY-ONE AND TWO HUNDRED FIFTY KILOWATTS IN
SIZE.
(B) THE AUTHORITY SHALL EXECUTE ITS SOLICITATION PLAN AND SHALL SUBMIT
TO THE COMPTROLLER, GOVERNOR, SPEAKER OF THE ASSEMBLY, TEMPORARY PRESI-
DENT OF THE SENATE, AND CHAIRS OF THE SENATE AND ASSEMBLY ENERGY COMMIT-
TEES, AND SHALL POST ON ITS WEBSITE, ITS SOLAR PROCUREMENT PLAN
COMPRISED OF ANY SOLAR PURCHASE AGREEMENTS FOR SRECS ASSOCIATED WITH
QUALIFIED SOLAR ENERGY GENERATION OTHER THAN SMALL RETAIL DISTRIBUTED
SOLAR ENERGY GENERATION. THE COMPTROLLER SHALL REVIEW SUCH PLAN TO
ASSESS WHETHER IT IS THE RESULT OF A FAIR, OPEN, COMPETITIVE AND TRANS-
PARENT PROCESS AND SHALL REPORT TO THE GOVERNOR, SPEAKER OF THE ASSEM-
BLY, TEMPORARY PRESIDENT OF THE SENATE, AND CHAIRS OF THE SENATE AND
ASSEMBLY ENERGY COMMITTEES REGARDING THE RESULTS OF SUCH ASSESSMENT.
(C) NO LATER THAN JULY FIRST, TWO THOUSAND TWELVE, THE AUTHORITY SHALL
SUBMIT TO THE GOVERNOR, SPEAKER OF THE ASSEMBLY, TEMPORARY PRESIDENT OF
THE SENATE, AND CHAIRS OF THE SENATE AND ASSEMBLY ENERGY COMMITTEES, AND
SHALL POST ON ITS WEBSITE, A PLAN FOR THE ACHIEVEMENT OF ITS OBLIGATION
PERTAINING TO THE PROCUREMENT OF SRECS ASSOCIATED WITH SMALL RETAIL
DISTRIBUTED SOLAR ENERGY GENERATION ESTABLISHED IN SUBDIVISION TWO OF
THIS SECTION.
4. NO LATER THAN JANUARY FIRST, TWO THOUSAND TWELVE, THE AUTHORITY
SHALL ESTABLISH A TARIFF THAT IT SHALL PAY TO APPLICABLE QUALIFIED SOLAR
ENERGY GENERATORS WITH WHICH THE AUTHORITY ENTERS INTO SOLAR PURCHASE
AGREEMENTS FOR THE PROCUREMENT OF SRECS ASSOCIATED WITH SMALL RETAIL
DISTRIBUTED SOLAR ENERGY GENERATION FOR THE PURPOSE OF ACHIEVING THE
AUTHORITY'S OBLIGATIONS PERTAINING TO SRECS ASSOCIATED WITH SUCH GENER-
ATION ESTABLISHED IN SUBDIVISION TWO OF THIS SECTION. THE AUTHORITY
A. 5713 11
SHALL ESTABLISH A SEPARATE TARIFF FOR THE PROCUREMENT OF SRECS ASSOCI-
ATED WITH SMALL RETAIL DISTRIBUTED SOLAR ENERGY GENERATION THAT IS
PRODUCED BY BUILDING INTEGRATED PHOTOVOLTAIC EQUIPMENT, WHICH SHALL BE
EQUIVALENT TO ONE HUNDRED TWENTY-FIVE PERCENT OF THE TARIFF APPLICABLE
TO SRECS ASSOCIATED WITH OTHER SOURCES OF SMALL RETAIL DISTRIBUTED SOLAR
ENERGY GENERATION. THE AUTHORITY SHALL REVIEW SUCH TARIFFS EVERY TWO
YEARS AND ADJUST AS NECESSARY TO ACHIEVE ITS OBLIGATIONS PERTAINING TO
SRECS ASSOCIATED WITH SMALL RETAIL DISTRIBUTED SOLAR ENERGY GENERATION
ESTABLISHED IN SUBDIVISION TWO OF THIS SECTION.
5. (A) IF THE AUTHORITY DETERMINES THAT ITS ANNUAL EXPENDITURES FOR
THE PROCUREMENT OF SRECS, MADE FOR THE PURPOSES OF MEETING THE ANNUAL
REQUIREMENT SET FORTH IN PARAGRAPH (A) OF SUBDIVISION TWO OF THIS
SECTION FOR A COMPLIANCE YEAR, EXCEEDS ONE AND ONE-HALF PERCENT OF ITS
ANNUAL RETAIL ELECTRICITY REVENUES FOR SUCH COMPLIANCE YEAR, THEN THE
ANNUAL REQUIREMENT FOR THE COMPLIANCE YEAR FOR WHICH THE AUTHORITY MAKES
ITS DETERMINATION SHALL CONTINUE TO BE THE ANNUAL REQUIREMENT APPLICABLE
IN EACH SUBSEQUENT COMPLIANCE YEAR UNTIL THIS LIMITATION ENDS AS
PROVIDED IN PARAGRAPH (B) OF THIS SUBDIVISION.
(B) IF THE LIMITATION PROVIDED FOR IN PARAGRAPH (A) OF THIS SUBDIVI-
SION IS TRIGGERED, IT SHALL END UPON A DETERMINATION BY THE AUTHORITY
THAT ITS ANNUAL EXPENDITURE FOR THE PROCUREMENT OF SRECS MADE FOR THE
PURPOSES OF MEETING ITS ANNUAL REQUIREMENT FOR A COMPLIANCE YEAR DID NOT
EXCEED ONE AND ONE-HALF PERCENT OF ITS ANNUAL RETAIL ELECTRICITY REVEN-
UES FOR SUCH COMPLIANCE YEAR. FOR THE COMPLIANCE YEAR IMMEDIATELY
FOLLOWING THE END OF THE LIMITATION PURSUANT TO THIS PARAGRAPH, THE
APPLICABLE ANNUAL REQUIREMENT SHALL BE THE REQUIREMENT SET FORTH IN
PARAGRAPH (A) OF SUBDIVISION TWO OF THIS SECTION FOR THE COMPLIANCE YEAR
IMMEDIATELY FOLLOWING THE COMPLIANCE YEAR FOR WHICH THE LIMITATION IN
PARAGRAPH (A) OF THIS SUBDIVISION WAS TRIGGERED. THE ANNUAL REQUIREMENT
SHALL CONTINUE TO INCREASE IN THE INCREMENTS PROVIDED FOR IN PARAGRAPH
(A) OF SUBDIVISION TWO OF THIS SECTION FOR EACH SUBSEQUENT YEAR UNTIL
THE ANNUAL REQUIREMENT REACHES THE PERCENTAGE SET FORTH IN SUCH PARA-
GRAPH FOR COMPLIANCE YEAR TWO THOUSAND TWENTY-FIVE.
6. (A) NO LATER THAN JULY FIRST, TWO THOUSAND FOURTEEN, AND NO LATER
THAN JULY FIRST OF EACH YEAR THEREAFTER THROUGH THE YEAR TWO THOUSAND
TWENTY-SIX, THE AUTHORITY SHALL REPORT TO THE GOVERNOR, SPEAKER OF THE
ASSEMBLY, TEMPORARY PRESIDENT OF THE SENATE, AND CHAIRS OF THE SENATE
AND ASSEMBLY ENERGY COMMITTEES, AND SHALL POST ON ITS WEBSITE, A REPORT
REGARDING ITS PROGRESS IN MEETING ITS OBLIGATIONS ESTABLISHED IN SUBDI-
VISION TWO OF THIS SECTION.
(B) EACH REPORT THAT SHALL BE SUBMITTED PURSUANT TO THIS SUBDIVISION
SHALL INCLUDE, BUT NOT BE LIMITED TO, FOR THE PREVIOUS CALENDAR YEAR AND
FOR THE TOTAL OF ALL CALENDAR YEARS TO DATE: (I) THE NUMBER OF SRECS
ASSOCIATED WITH QUALIFIED SOLAR ENERGY GENERATION RETIRED FOR THE
PURPOSES OF MEETING THE AUTHORITY'S OBLIGATIONS ESTABLISHED IN SUBDIVI-
SION TWO OF THIS SECTION; (II) THE NUMBER OF SUCH SRECS EACH ASSOCIATED
WITH SMALL RETAIL DISTRIBUTED SOLAR ENERGY GENERATION, RETAIL DISTRIB-
UTED SOLAR ENERGY GENERATION PRODUCED BY EQUIPMENT THAT IS BETWEEN
FIFTY-ONE AND TWO HUNDRED FIFTY KILOWATTS IN SIZE AND RETAIL DISTRIBUTED
SOLAR ENERGY GENERATION PRODUCED BY EQUIPMENT OF ANY SIZE THAT WERE
PROCURED; (III) THE NUMBER OF SUCH SRECS PROCURED THROUGH SOLAR PURCHASE
AGREEMENTS AND THE AUTHORITY'S OWNERSHIP OF QUALIFIED SOLAR ENERGY
GENERATION EQUIPMENT, RESPECTIVELY; (IV) THE AMOUNT PAID TO QUALIFIED
SOLAR ENERGY GENERATORS FOR SRECS ASSOCIATED WITH SMALL RETAIL DISTRIB-
UTED SOLAR ENERGY GENERATION THROUGH THE TARIFFS ESTABLISHED PURSUANT TO
SUBDIVISION FOUR OF THIS SECTION; AND (V) THE ANNUAL RETAIL ELECTRICITY
A. 5713 12
SALES REVENUE AND EXPENDITURES MADE FOR THE PROCUREMENT OF SRECS FOR THE
PURPOSE OF MEETING THE APPLICABLE ANNUAL REQUIREMENT, PROVIDED THAT SUCH
INFORMATION NEED ONLY BE REPORTED FOR THE PREVIOUS CALENDAR YEAR.
S 6. If any provision of this act is, for any reason, declared uncon-
stitutional or invalid, in whole or in part, by any court of competent
jurisdiction, such portion shall be deemed severable, and such unconsti-
tutionality or invalidity shall not affect the validity of the remaining
provisions of this act, which remaining provisions shall continue in
full force and effect.
S 7. This act shall take effect immediately; provided, however, that
this act shall expire and be deemed repealed on the date the chairman of
the public service commission notifies the legislative bill drafting
commission of the occurrence of the implementation of a substantially
similar federal program.

Open Legislation comments facilitate discussion of New York State legislation. All comments are subject to moderation. Comments deemed off-topic, commercial, campaign-related, self-promotional; or that contain profanity or hate speech; or that links to sites outside of the nysenate.gov domain are not permitted, and will not be published. Comment moderation is generally performed Monday through Friday.
*By contributing or voting you agree to the Terms of Participation and Privacy Policy and verify you are over 13.
Discuss!
blog comments powered by Disqus